Mitsubishi Electric L26CPU-BT User Manual page 466

Melsec-l cc-link system master/local module
Hide thumbs Also See for L26CPU-BT:
Table of Contents

Advertisement

(6) Operating procedure of the loop test
[Diagnostics]
1.
Select "CC-Link" for "Module Setting".
2.
Specify the target master module of loop test for "Module No." or "I/O Address".
3.
Click the [Start Monitoring] button.
4.
Click the [Loop Test] button.
5.
When checking the communication status of all stations
Select "All stations" for "Target station", and click the [Execute Test] button.
6.
When checking the communication status of specified modules
Select "Selected station No." for "Target station", specify the station number, and click the [Execute Test]
button.
464
[CC-Link / CC-Link/LT diagnostics]

Advertisement

Table of Contents
loading

This manual is also suitable for:

L26cpu-pbtLj61bt11

Table of Contents