DDEC VI ELECTRONIC CONTROLS APPLICATION AND INSTALLATION

Main Power Shutdown

The main power supply shutdown schematic shows the DDC approved method for main power
switch implementation. See Figure 3-12.
Figure 3-12
Main Power Supply Shutdown
NOTE:
Switches must remain closed for 30 seconds after ignition is off for the MCM and CPC to
write non-volatile data.
NOTE:
It is recommended that both the positive (+) and negative (-) battery leads be
disconnected.
3-67