Server Installation Checklist - Avaya S8800 Installing Manual

Server for modular messaging
Hide thumbs Also See for S8800:
Table of Contents

Advertisement

• Do not step on or stand on any component when servicing other components in a
• Do not place any object on top of rack-mounted components.
Caution:
Use caution when pressing the component rail release latches and sliding a
component into or out of a rack; the slide rails can pinch your fingers.

Server installation checklist

#
1
Verify that all equipment is on
site.
2
Verify that the rack is installed
according to the
manufacturer's instructions
and in accordance with all
local codes and laws.
3
Verify that the rack is
grounded in accordance with
local electrical code.
4
Remove the cabinet doors, if
necessary.
7
Attaching rails to the rack
page 14
8
Installing the server in the
rack
Install the cable
management arm
Installing the Avaya S8800 Server for Modular Messaging
blank filler panel to cover the open space and to help ensure proper air
circulation.
rack.
Task
on page 15
(optional)
Notes
Compare the list of items that were
ordered to the contents of the boxes.
Use the inventory list provided by your
project manager. Do not rely on the
packing slips inside the boxes for the
correct information.
See Approved Grounds (555–245–
772), available at
support.avaya.com.
See the cabinet manufacturer's
documentation.
on
Server installation checklist
http://
October 2009
13

Advertisement