Dlp- D239 Delete A Roll - Cisco ONS 15454 SDH Procedure Manual

Hide thumbs Also See for ONS 15454 SDH:
Table of Contents

Advertisement

Chapter 19
DLPs D200 to D299
DLP-D239 Delete a Roll
Purpose
Tools/Equipment
Prerequisite Procedures
Required/As Needed
Onsite/Remote
Security Level
From the View menu, choose Go To Network View.
Step 1
Click the Circuits > Rolls tabs.
Step 2
Step 3
Click the rolled circuit that you want to delete.
Step 4
From the Tools menu, choose Circuits > Delete Rolls.
Step 5
In the confirmation dialog box, click Yes.
Return to your originating procedure (NTP).
Step 6
DLP-D240 Cancel a Roll
Purpose
Tools/Equipment
Prerequisite Procedures
Required/As Needed
Onsite/Remote
Security Level
Caution
If you click cancel while performing a Dual roll in Manual mode and have a valid signal detected on both
rolls, you will see a dialog box stating that this can cause a traffic hit and asking if you want to continue
with the cancellation. Cisco does not recommend cancelling a dual roll when a valid signal has been
detected. To return the circuit to the original state, Cisco recommends completing the roll, then using
bridge and roll again to roll the circuit back.
78-17194-01
This task deletes a roll. Use caution when selecting this option, traffic
might be affected. Delete a roll only if it cannot be completed or cancelled
in normal ways. Circuits might have a PARTIAL status when this option is
selected. See
Table 20-31 on page 20-77
statuses.
None
DLP-D60 Log into CTC, page 17-49
NTP-D332 Bridge and Roll Traffic, page 7-9
As needed
Onsite or remote
Provisioning or higher
This task cancels a roll. When the roll mode is Manual, you can only cancel
a roll before you click the Complete button. When the roll mode is Auto,
cancel roll is only allowed before a good signal is detected by the node or
before clicking the Force Valid Signal button. A dual or single roll can be
cancelled before the roll state changes to ROLL_COMPLETED.
None
DLP-D60 Log into CTC, page 17-49
NTP-D332 Bridge and Roll Traffic, page 7-9
As needed
Onsite or remote
Provisioning or higher

DLP- D239 Delete a Roll

for a description of circuit
Cisco ONS 15454 SDH Procedure Guide, R7.0
19-43

Advertisement

Table of Contents
loading

Table of Contents