Dlp- D98 Provision A High-Order Circuit Route - Cisco ONS 15454 SDH Procedure Manual

Hide thumbs Also See for ONS 15454 SDH:
Table of Contents

Advertisement

DLP- D98 Provision a High-Order Circuit Route

If you need to create a secondary source, for example, an SNCP ring bridge/selector circuit entry point
Step 4
in a multivendor SNCP ring, click Use Secondary Source and repeat Steps
secondary source.
Click Next.
Step 5
Step 6
From the Node drop-down list, choose the destination node.
Step 7
From the Slot drop-down list, choose the slot containing the optical card where the circuit will terminate
(destination card). (If a card's capacity is fully utilized, the card does not appear in the list.)
Depending on the card selected in
Step 8
VC-4 drop-down lists. The Port drop-down list is available only if the card has multiple ports. The VC-4s
that appear depend on the card, circuit size, and protection scheme.
If you need to create a secondary destination, for example, an SNCP ring bridge/selector circuit entry
Step 9
point in a multivendor SNCP ring, click Use Secondary Destination and repeat Steps
define the secondary destination.
Click Next.
Step 10
Return to your originating procedure (NTP).
Step 11
DLP-D98 Provision a High-Order Circuit Route
Purpose
Tools/Equipment
Prerequisite Procedures
Required/As Needed
Onsite/Remote
Security Level
In Route Review/Edit area of the Circuit Creation wizard, click the source node icon if it is not already
Step 1
selected.
Starting with a span on the source node, click the arrow of the span you want the circuit to travel. The
Step 2
arrow turns white. In the Selected Span area, the From and To fields show span information. The source
VC-4 appears.
Cisco ONS 15454 SDH Procedure Guide, R7.0
17-96
Step
2, choose the destination port and/or VC-4 from the Port and
This task provisions a high-order circuit route for manually routed circuits.
None
DLP-D60 Log into CTC, page 17-49
NTP-D324 Create a Manually Routed High-Order Circuit, page 6-60
You must have the Route Review/Edit page of the Circuit Creation wizard
open.
As needed
Onsite or remote
Provisioning or higher
Figure 17-18
shows an example.
Chapter 17
DLPs D1 to D99
1
through
3
to define the
6
through
8
to
78-17194-01

Advertisement

Table of Contents
loading

Table of Contents