Final Check - Avaya Media Processing Server 1000 Hardware Installation And Maintenance

Hide thumbs Also See for Media Processing Server 1000:
Table of Contents

Advertisement

peri@scn1 {2} ls -al
total 14
2 drwxrwxr-x
8 drwxrwxr-x
2 lrwxrwxrwx
../../devices/pci@1f,4000/ebus@1/se@14,400000:a
2 lrwxrwxrwx
../../devices/pci@1f,4000/ebus@1/se@14,400000:b
b. Change directory (cd) to /etc and view (more or cat) the file remote. Check for the
following statements in the file.
hardwire:\
:dv=/dev/term/b:br#9600:el=^C^S^Q^U^D:ie=%$:oe=^D:
hardwirea:\
:dv=/dev/term/a:br#9600:el=^C^S^Q^U^D:ie=%$:oe=^D:
3. Connect the A/B connector of a Y adapter to the serial port on the application processor.
4. Connect the DB25 to 8-pin DIN cable from one of the ports (A or B) on the Y adapter to the
system port to be checked.
5. Open permissions on the symbolic links:
chmod 777 /dev/term/*
6. Enter the command tip hardwire (default, for port B) or tip hardwirea (for port A).
Note:
When the tip session is closed, permissions on the symbolic links are returned to their original
state.

Final Check

Use the
Installation Check List
October 2014
2 root
root
17 root
sys
1 root
root
1 root
root
on page 252 and verify that all tasks are successfully completed.
Avaya Media Processing Server 1000 Hardware Installation and Maintenance
Comments? infodev@avaya.com
512 Jun 11 23:52 ./
3584 Sep 17 11:53 ../
47 Jun 11 23:52 a ->
47 Jun 11 23:52 b ->
Final Check
159

Advertisement

Table of Contents
loading

Table of Contents