Performing The Post Rollout Steps - Avaya Media Processing Server 1000 Hardware Installation And Maintenance

Hide thumbs Also See for Media Processing Server 1000:
Table of Contents

Advertisement

Maintenance
A list of disk drives are presented.
• 72
• 146
• 300
4. Select the disk size.
Note:
The numbers listed above are the actual (raw/unformatted) disk drive size so the
numbers displayed on the screen will be little bit different (formatted).
A list of wim images is presented, with the default being the last one found. Select the one
that matches the server type.
If server type is
HP G5
HP G7
HP Gen8
HP G7 2003
IBM X3550 Clovertown
3.5" HDD
IBM x3550 Harpertown
2.5" HDD
IBM x3550 Woodcrest
3.5" HDD
IBM x3550 M3
IBM x3550 M4
The script applies the image selected above and the Windows operating system will be
installed.
The System reboots.
5. Perform on of the following steps:
• For 2008, go to
• For 2003, go to

Performing the post rollout steps

Procedure
1. Reboot to new system, setup runs and reboots.
Avaya Media Processing Server 1000 Hardware Installation and Maintenance
204
Select Image
2008_g8765_rc8
2003_g7_rc4
2008_x3550hcw_rc7
2008_x3550m34_rc5
Performing the post rollout steps
Performing post rollout steps for Windows 2003
Comments? infodev@avaya.com
on page 204
on page 207
October 2014

Advertisement

Table of Contents
loading

Table of Contents