Completion Instructions

Field Engineer performing the installation must complete this form on site.
Place N/A in all spaces that are not applicable to this customer site and/or installation. Do Not Leave
Blank Spaces.
The Field Engineer completes this form just as soon as all hardware is installed and tested. Any and
all exceptions must be noted where specified.
When the form is completed, it is forwarded to your Immediate Supervisor for distribution.

Installation Requirements

Completion of the following items constitutes Field Operation requirements for hardware installation.
1. The shipper places the systems in their permanent locations and removes the shipping
material. The systems are not moved by installation personnel.
2. Complete an inventory of the order.
3. Internally connect all cables brought into the system to the cabinet. Also connect all
intercabinet cabling, in order, to each cabinet.
4. Set up the system in accordance with the Avaya MPS 1000 Commissioning Guide.
5. Power up the system, run (successfully) all internal self-tests, and observe that a proper boot
up occurs.
6. Run the Field Factory Test to test that all installed products are fully operational.
7. Run any approved diagnostic on all APs installed to ensure that they are fully operational.
8. Network the system internally to other Avaya products and to the customer LAN according to
the LAN diagram provided by the customer.
9. Verify all licensing matches the order.
October 2014