Installing Hardware and Connectivity
3. Set all circuit breakers to off.

Connecting Power

1. Test the commercial power source for proper voltage (see theMPS 1000 Installation Site
Survey for voltage requirements).
2. Set the main circuit breakers in the rear of the cabinet to off.
3. Connect the AC power cords to the commercial power outlet for each cabinet.
4. Turn on the main circuit breakers. After a few seconds, the green System OK LED on the
Fan Control Panel lights.
Figure 46: Fan Control Panel
Avaya Media Processing Server 1000 Hardware Installation and Maintenance
72