Site Status; Deviations And General Status - Avaya Media Processing Server 1000 Hardware Installation And Maintenance

Hide thumbs Also See for Media Processing Server 1000:
Table of Contents

Advertisement

Site Status

Was the Preinstallation Site Survey completed prior to this installation? □ Yes □ No
Was the Site Readiness Checklist received prior to the scheduling of this installation? □ Yes □ No
Who signed the Site Readiness Checklist form?
When was it received?
If the Preinstallation Site Survey and the Site Readiness Checklist were completed, note any
deviations or uncompleted items at the time of the installation.
Was a customer Purchase Order # and bill issued to cover the costs? □ Yes □ No

Deviations And General Status

List the deviations in the space provided. Be sure to include any DOA parts, parts that failed during
installation, items configured improperly, any required hardware not listed on the SDP, incorrect
cables or connections, and so on.
What can be done on this installation to make it more productive and easier to install, for you or for
the customer?
October 2014
Avaya Media Processing Server 1000 Hardware Installation and Maintenance
Comments? infodev@avaya.com
Site Status
251

Advertisement

Table of Contents
loading

Table of Contents