MACHINE INSTALLATION
⇒
c) Hold the development unit. At the
same time, slowly pull out the tape
horizontally.
d) Push in each development unit
e) Lower the drum plate. Then tighten
two screws that hold the plate (the
upper left one first, then the lower
right one). Return the transfer belt
release lever to its operational position. (See Step a).
2. Remove the pin [A]. (As shown on the previous page.)
NOTE: Keep the pin. You may need it to transport the machine in the future
(
3. Remove the tape from the oil supply unit.
B147/B149/B190
1.4.3).
B146I913.WMF
1-8
Rev. 10/2004
B146I914.WMF
SM