Installation Flow Chart - Gestetner B147 Service Manual

Table of Contents

Advertisement

1.3.2 INSTALLATION FLOW CHART

The following flow chart shows the flow of the installation procedures.
Start
Unpack the copier.
Will the paper feed
unit or LCT installed?
Yes
Place the copier on the paper feed unit or
LCT, and install it.
Will the controller options installed?
Yes
Install the controller options.
Install the platen cover or ARDF.
Will the two-tray finisher
or booklet finisher installed?
Yes
Will the punch unit installed?
Yes
Install the punch unit.
Install the finisher.
A
The finisher requires an optional paper tray unit or the LCT.
A punch unit is dedicated to the two-tray finisher or the booklet finisher.
SM
Set the date and time.
No
Check magnification and registration.
Adjust the operation panel display if
No
Specify the settings relevant to the
contract (see section 1.4.1).
No
No
1-5
COPIER
A
Install the copier.
Select the language.
Perform ACC.
necessary.
End
B146I901.WMF
B147/B149/B190

Advertisement

Table of Contents
loading

This manual is also suitable for:

B149B190

Table of Contents