BOMBARDIER 1982 Shop Manual page 380

Table of Contents

Advertisement

SECTION 05 SUSPENSION
SUB-SECTION 05
(TRACK)
To correct alignment, loosen link plate spring lock nut
on side where track is closest to the link plate.
Turn track adjuster bolt on same side, clockwise until
track re-aligns.
Tighten link plate spring lock nut
.
Alignment
(slide
suspension all models)
With rear of vehicle supported off the ground, start engine
and allow the track to rotate
slowly.
Check
that
track
is well centered and turns evenly. To
correct, stop engine then loosen the lock nuts and
tighten the adjuster bolt on side where guides are closest
to slide. Tighten lock nuts and recheck alignment.
(TYPICAL)
WARNING:
Before checking track alignment, en-
sure that the
track is
free of
all
particles
which
could be thrown out
while track is
rotating. Keep
hands,
tools, feet
and clothing clear of track.
TRACK
INSERT INSTALLATION
Using N°.
529004500
tool (with two
standard
jigs)
("Moto-Ski" jig PIN 529004 300)
Tilt vehicle on its side to expose the track notches then
place insert into position
.
PAGE 380
Place the track insert installer into track notches and
position male jig on top of track insert.
Tighten installer bolt until
track
insert is locked in place
.
_
CAUTION: To prevent damages and
for
an easier
. . operation of the
tool,
apply grease on
male jig,
female
jig
and
to
the
installer bolt
threads.
Femalejig
Using
N°.
529002600 tool
For narrow
;ooort'~
.(
For wide inserts
Place inserts into position and, with tool being under
the inserts, tap them over the track using a hammer.
Q
t==\
IFJDt==\
!==-c::=
J
9t
------------>A~~----
Tool
- - - - - - - - - - -

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents