SPARK TEST
a)
Before
performing this test, ensure that the control
unit and the control unit diode (if
applicable) have
been
checked.
b) Disconnect the checker
from the
connector of the
control unit output
side
(originally connected to the
ignition coil).
(Vehicle wiring)
Breakerless
magneto
To be
connected
I
\
Ignition coil
C) Connect the ignition coil connectors
to
the control
unit
connecto
rs.
d) Connect the grounding wire to the checker and to a
bore surface of the engine
.
Grounding wire
e) Set the selector to
CONTROL
UNIT
position.
f)
Remove the noise suppressor and the
protection
cap
from the end of high-tension wire.
fh
tJ
~
is;;0n
cap
Noise
High-tension
cable
suppressor
SECTION 04 ELECTRICAL
SUB-SECTION 07
(TESTING
PROCEDURE)
g) Keep the distance 5 mm
(3/16")
or less between bare
surface of the engine and end of high-tension cable
and depress the
START
SWITCH
.
Then
spark
will
take place between them.
Hold
by
insulator
'-...
5
mm
or
less
13116")
WARNING: Do not touch the high tension wire
while doing this procedure. Hold high tension
wire
with an insulator.
Generator coil test
a)
This test
should be performed at both HI
&
La switch
positions
.
Switch La
position and set the selector to
GENERATOR
COIL position
.
b) Crank the engine and read the LED level indicator
.
Reading should be:
for 4-4P: from
2
to
8
for 4-5P: from
2
to
8
C) Switch to
HI
position and repeat procedure.
Reading
should be:
for 4-4P: from
3
to
8
for 4-5P: from
2
to
8
Control unit test
a)
To
perform this test, switch can be at
La
or
HI
posi-
tion.
b) Set the selector to CONTROL
UNIT
position
.
c)
Depress START
switch for
5 seconds
minimum and
read LED
level
indicator. Reading should be:
for
4-4P
:
from
4
to
5
for 4-5P:
from
4
to
5