Power verification

Check that an adequate number of power outlets are available. Verify that the G350 Media
Gateway and the other equipment in the rack do not present a possible overcurrent or overload
to the customer's branch circuit and/or power distribution strip. Power requirements are listed in
Appendix B: Technical
!
WARNING:
Do not overload the power circuit.
WARNING:

Grounding verification

Ensure that the installation site has access to approved grounds and that either a trained
technician or a licensed electrician will be verifying all grounds and installing the Supplementary
Ground Conductor (consult
!
WARNING:
Installation in a Restricted Access Location and secure access are required in
WARNING:
Finland and Norway and Sweden.
The G350 Media Gateway relies on two ground connections (mains plug with an earth contact
and a permanent Supplementary Ground Conductor). Because of unreliable earthing concerns
in Finland, Norway, and Sweden, the G350 Media Gateway must be installed in a Restricted
Access Location (RAL). An RAL is defined as an access that can be gained only by trained
service personnel or customers who have been instructed about the reasons for the restricted
access and any safety precautions that must be taken. In these cases, access to the G350
Media Gateway is gained by the use of a tool (such as a lock and key) or other means of
security. If you have any questions about the safety conditions, contact your project manager.
When you have verified that the site is ready for a safe installation, proceed with the installation.
specifications.
Step 3: Attach ground conductors
Site requirements
on page 40).