Download Print this page

Clamp Plate Opening Mechanism - Riso RZ9 Series Technical Manual

Hide thumbs Also See for RZ9 Series:

Advertisement

CHAPTER 10: CLAMP UNIT
DANKA AUSTRALIA PTY. LTD.

2. Clamp Plate Opening Mechanism

When the START key is pressed for the master-making or confidential-master making, the print drum starts to
rotate from its position-B. After the presence of the master on the print drum is checked and as the print drum
returns to position-B, the print drum stops once and starts the clamp plate opening action. The clamp motor
activates and rotates the clamp cam until the light path of the clamp sensor-B is blocked by the disc. This
action brings the clamp opening cam down.
The print drum then rotates to start the master removal action. The clamp opening cam, at its lowered position,
opens the clamp plate first, and then lifts the master ejection plate to eject the leading edge of the master out
from under the clamp plate.
Clamp sensor-B
Clamp cam
Clamp opening cam
Clamp plate
Master ejection plate
Master
1003
1004
1005
[ 10 - 3 ] - Rev. 0.2
RZ9 Series

Advertisement

loading

This manual is also suitable for:

Rv9 series