Download Print this page

Riso RZ9 Series Technical Manual page 186

Hide thumbs Also See for RZ9 Series:

Advertisement

CHAPTER 6: SECOND PAPER FEED SECTION
<< Working on the rear of the machine - continued >>
(7) Remove the E-ring, and then remove the timing gear and timing gear housing assembly.
(8) Remove the E-ring, and then remove the collar and the timing roller bearing assembly.
Timing gear housing assembly
<< Working on the front of the machine >>
(9) Remove the paper sensor (send).
(10) Remove screw (M3x8: 1pc) from the load spring collar. Then remove load spring and load spring collar.
(11) Remove the washer, and also the bearing from the timing roller adjusting plate.
(12) Make a little timing roller slide to rear side, and then remove the timing roller from the bottom.
Load spring
DANKA AUSTRALIA PTY. LTD.
0617
Timing roller bearing assembly
Timing gear
Load spring collar
0619
[ 6 - 12 ] - Rev. 0.2
Timing roller
adjusting plate
Washer
0618
collar
Bearing
0620
RZ9 Series

Advertisement

loading

This manual is also suitable for:

Rv9 series