Download Print this page

Removing The Main Belt - Riso RZ9 Series Technical Manual

Hide thumbs Also See for RZ9 Series:

Advertisement

CHAPTER 3: MAIN DRIVE

2. Removing the Main Belt

(1) Remove the Pressure spring.
(2) Insert 8mm diameter shaft JIG into the position-B phase alignment hole on the paper feed timing area (refer
to page 3-6.)
(3) Unplug the position B sensor connector and remove detachable wire band (1 pc) from main cover assembly.
(4) Loosen screws (M4x8 : 2pcs) on the tension lever, and release the tension of the main belt.
(5) Remove the Sponge part.
(6) Detach the main motor bearing assembly (M4x8 : 3pcs).
(7) Dismount the main cover assembly (M4x8 : 5pcs).
- continued on next page -
Detachable wire band
0332
Tension lever
Main motor bearing assembly
DANKA AUSTRALIA PTY. LTD.
Position B sensor
[ 3 - 8 ] - Rev. 0.2
Main shaft assembly
Main cover assembly
0333
DSC05350
RZ9 Series

Advertisement

loading

This manual is also suitable for:

Rv9 series