Running A Tim Sequence; Running An Electrode Calibration Sequence - Radiometer Analytical TitraLab 870 Reference Manual

Ph/ep/ip/ec/ise titration workstation
Table of Contents

Advertisement

TitraLab
®
Running a TIM
sequence
Running an
electrode
calibration
sequence
Page 218
1. Select sequence,
2. If Question marks "?" are present in the Electrode and/or Reagent
tabs, it means that the method needs to be programmed - an
electrode and/or a reagent is missing. Review programming in
Supervisor mode.
3. Connect/calibrate the electrode(s).
Refer to "Electrode connection", page
Refer to "Calibrate electrodes", page
4. Install/calibrate reagent(s).
Refer to "Install reagent", page
Refer to "Calibrate reagents", page
5. Prepare the sample stack.
Refer to "Sample stack", page
6. When Sunny icons are visible in the Electrode and Reagent tabs:
- Press 1 in the Main window to run the sequence from the first
beaker of the sample stack,
- To run a sequence from a given beaker number of the sequence,
press 2 in the Main window and 4 Start from...
If you have a problem running the analysis, the Titration
Manager will guide you through the necessary operations so
that you are able to run the analysis in no time at all.
For the following steps:
Refer to "Run window", page
Refer to "Electrode calibration (SAC sequence)", page
TitraLab 870 Reference Manual
see "Select sequence", page
114.
72.
140.
72.
225.
Use the Left/Right arrow keys to select the
beaker you want to start the sequence then
press 1 Start from...
Limitations: you can only start a sequence:
- from the first beaker of an electrode or reagent
calibration,
- or when several replicates (tests) are edited
for a same sample, from the first beaker of that
sample.
213.
227.
111.

Advertisement

Table of Contents
loading

Table of Contents