Download Print this page

GE Vivid S5 N Service Manual page 688

Hide thumbs Also See for Vivid S5 N:

Advertisement

P R E L I M I N A R Y
GE
P
N
FN091065, R
ART
UMBER
4.) Attach the TR32 Boards to the RFI Board by gently pressing the two parts together as shown in
Figure
5) Return the TR32 and RFI Board assembly - together with the Heat Sink pad - to the appropriate
position in the cage assembly -
Note:
When performing this step, carefully slide the Heat Sink into position.
Thermal Pad
Figure 8-204 Refitting TR32 and RFI Assembly (incl. Thermal Pad) into the Cage Assembly
6) Reconnect the BEP-to-RFI flex cable to the cable connector on RFI Board, as shown in
Figure 8-193 on page
7) Reconnect the power cable to the RFI Board - see
8-162
2
EVISION
8-203.
Figure 8-203 Attaching the TR32 Boards to the RFI Board
8-157.
Section 8-6 - Lower Section Components Replacement Procedures
Figure
8-204.
Figure
VS5 N
VS6 N
AND
TR32 and RFI
Assembly
8-193.
S
M
ERVICE
ANUAL

Hide quick links:

Advertisement

loading

This manual is also suitable for:

Vivid s6 n