Initial Voltage Measurements - CPI CMP 200 Series Service Manual

X-ray generator
Hide thumbs Also See for CMP 200 Series:
Table of Contents

Advertisement

CPI Canada Inc.
2.10.1 Auxiliary Transformer Line Voltage Tap Selection (Cont)
4.
Based on the nominal line voltage, set the transformer primary voltage tap as follows:
Loosen the clamping screws for the current line-voltage tap, and for the required line-voltage
tap.
Connect to the 400 V tap if the line voltage is nominally 400 VAC.
Connect to the 480 V tap if the line voltage is nominally 480 VAC.
Retighten both of the clamping screws.

2.10.2 Initial Voltage Measurements

1.
If the mains supply is compatible with the generator, switch on the main breaker and / or the
disconnect switch and check for the following voltages:
NOTE:
WARNING:
2.
Measure and record the voltage across the main line fuses in the generator. Single-phase units
will only use one set of voltage measurements.
L1 phase to L2 phase: ______ VAC.
L1 phase to L3 phase: ______ VAC.
L2 phase to L3 phase: ______ VAC.
3.
Are the line-to-line and line-to-ground voltages within specification for the unit? For single phase
230 V units, the line to ground voltage should be 99 – 127 V. For 3 phase units, the phase to
ground voltage should be 114 – 146 V for 208 / 230 V units, 230 V ± 10 % for 400 V units, and
277 V ± 10 % for 480 V units.
___ Check
4.
Confirm that the auxiliary transformer line voltage taps are set to the appropriate position as per
the measured line voltage.
___ Check
5.
If a 400 V unit with the optional dual-speed starter is reconfigured for 480 V, or a 480 V unit is
reconfigured for 400 V, the dual speed starter EPROM will need to be changed as described in
the section EPROM type / dual speed starter. Confirm that this has been done.
___ Check
Use and disclosure is subject to the restrictions on the title page of this CPI document.
®
CMP 200
X-Ray Generator Service Manual
DO NOT SWITCH THE GENERATOR ON AT THIS TIME (ONLY THE AC MAINS TO
THE GENERATOR IS TO BE SWITCHED ON).
USE EXTREME CARE IN MEASURING THESE VOLTAGES. ACCIDENTAL CONTACT
WITH MAINS VOLTAGES MAY CAUSE SERIOUS INJURY OR DEATH.
MAINS VOLTAGE WILL BE PRESENT INSIDE THE GENERATOR CABINET, EVEN
WITH THE CONSOLE SWITCHED OFF.
THE DC BUS CAPACITORS MAY PRESENT A SAFETY HAZARD FOR A MINIMUM
OF 5 MINUTES AFTER THE GENERATOR HAS BEEN SWITCHED OFF. CHECK
THAT THESE CAPACITORS ARE DISCHARGED BEFORE TOUCHING ANY PARTS
IN THE GENERATOR.
L1 phase to ground: ______ VAC.
L2 phase to ground: ______ VAC.
L3 phase to ground: ______ VAC.
Ch # 901476-02
Rev. C
2
Installation
Page 2-33

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cmp 200 dr series

Table of Contents