Tools and test Equipment Required

The following is a checklist of recommended tools and test equipment for installation and calibration of
the generator.
CHECK √
General hand tools for installation: Wrenches, nut drivers, assortment of
screwdrivers, pliers, etc.
If the generator is to be anchored to the floor, suitable tools (i.e. drill, drill bits,
etc) and mounting hardware must be available.
A supply of connectors for wiring: terminal lugs, caps, splices etc.
A calibrated DVM that indicates true RMS voltages.
Dual trace memory oscilloscope with a minimum 20 MHz bandwidth;
appropriate leads, probes, etc.
Device for measuring true kVp. This may be a Dynalyzer equivalent or a non-
invasive meter such as the Keithley TRIAD system.
A calibrated radiation meter with detectors that will allow for R/min and uR
type measurements (or uGy and Gy/min).
A suitable mA / mAs meter.
A strobe or reed type tachometer to verify that the anode is rotating up to
speed.
A sufficient selection of absorbers to allow AEC calibration if this option is
fitted. A suggested selection is Lexan in thickness of 5.0, 10.0, and 15.0 cm,
or water in plastic containers of homogenous density in thickness of 5.0, 10.0,
and 15.0 cm.
Vapor proof compound for the HT terminations.
Use and disclosure is subject to the restrictions on the title page of this CPI document.
®
CMP 200
X-Ray Generator Service Manual
®
®
/ CMP 200
DR operator console dimensions
DESCRIPTION
Ch # 901476-01
Pre-installation
Rev. C
1
Page 1-23

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cmp 200 dr series

Table of Contents