ACCEPTANCE TESTS (kV, TIME, mA AND mAs) Cont
Step
8.
Select 75 kV.
Select the mAs shown below (2 point
operation).
Measure time at 75% of the peak kV
waveform.
A: 2 mAs (time per LCD display)
B: 8 mAs (time per LCD display)
C: 25 mAs (time per LCD display)
D: 63 mAs (time per LCD display)
9.
Select 200 mA, 50 ms (3 point operation).
Select the kV values shown below.
Verify the actual kV per the RESULT column.
A: 50 kV
B: 60 kV
C: 80 kV
D: 100 kV
E: 125 kV
10.
Select 75 kV, 50 ms (3 point operation).
Select the mA values shown below.
Measure mA at 75% of the peak kV waveform.
Verify the actual mA per the RESULT column.
A: 50 mA
B: 100 mA
C: 200 mA
D: 400 mA
4.5.0
ACCEPTANCE TESTS (AEC)
This section applies only to generators with AEC.
Review chapter 3D: AEC Calibration.
Recheck the mAs, dose, and O.D. as recorded during initial installation. Follow the appropriate steps
in chapter 3D to verify the AEC calibration.
4.6.0
ACCEPTANCE TESTS (DR INTERFACE)
For CMP 200® DR X-ray generators with a DR imaging system, follow the system manufacturer's
recommendations for system test to verify the DR interface.
Use and disclosure is subject to the restrictions on the title page of this CPI document.
®
CMP 200
X-Ray Generator Service Manual
Action
Ch # 901476-06
Acceptance Testing
Result
Use the time displayed in the
LCD window as the reference for
the measurements below.
ms per LCD disp ± (2% + 1ms).
ms per LCD disp ± (2% + 1ms).
ms per LCD disp ± (2% + 1ms).
ms per LCD disp ± (2% + 1ms).
A: 50 kV ± (3% + 1 kV).
B: 60 kV ± (3% + 1 kV).
C: 80 kV ± (3% + 1 kV).
D: 100 kV ± (3% + 1 kV).
E: 125 kV ± (3% + 1 kV).
A: 50 mA ± (5% + 1 mA).
B: 100 mA ± (5% + 1 mA).
C: 200 mA ± (5% + 1 mA).
D: 400 mA ± (5% + 1 mA).