Locating and Mounting the Generator

The main generator cabinet is self-standing and does not need to be supported. However, the installation
should meet the following requirements:
The floor must be flat and level.
The generator installation area must be clean and free of dirt or debris.
The installer must supply generator hold-down brackets, if required. Alternately, mounting holes have
been provided in the base of the generator. The generator may then be anchored to the floor via
these holes.
Sufficient room must be provided to allow access to the rear and side of the generator for installation
and service. See figure 1-1 for recommended clearances.
A cable trough, conduit, or raceway (1 in; 2.5 mm, diameter) should be provided from the control
console to the main cabinet to allow routing of the control cable if required.
The control console is normally freestanding on a desk or shelf. It may be anchored if necessary.
Use and disclosure is subject to the restrictions on the title page of this CPI document.
®
CMP 200
X-Ray Generator Service Manual
Figure 1-1: Generator clearances
Ch # 901476-01
Pre-installation
Rev. C
1
Page 1-21

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cmp 200 dr series

Table of Contents