CPI Canada Inc.
3D.3.0 AEC CALIBRATION (TABLE BUCKY) Cont
Record the final measurements in a copy of the table below. The final measurements are those obtained AFTER films have been developed to
verify the correct O.D. at each breakpoint.
FILM SCREEN 1
#1 BK. POINT = 75 kV
#2 BK. POINT = 55 kV
#3 BK. POINT = 50 kV
#4 BK. POINT = 65 kV
#5 BK. POINT = 110 kV
#6 BK. POINT = 130 kV
#7 BK. POINT = 85 kV
#8 BK. POINT = 95 kV
FILM SCREEN 1
#1 BK. POINT = 75 kV
#2 BK. POINT = 55 kV
#3 BK. POINT = 50 kV
#4 BK. POINT = 65 kV
#5 BK. POINT = 110 kV
#6 BK. POINT = 130 kV
#7 BK. POINT = 85 kV
#8 BK. POINT = 95 kV
Use and disclosure is subject to the restrictions on the title page of this CPI document.
®
CMP 200
Service Manual
SPEED =
mAs =
CAL. NO. =
mAs =
CAL. NO. =
mAs =
CAL. NO. =
mAs =
CAL. NO. =
mAs =
CAL. NO. =
mAs =
CAL. NO. =
mAs =
CAL. NO. =
mAs =
CAL. NO. =
SPEED =
mAs =
CAL. NO. =
mAs =
CAL. NO. =
mAs =
CAL. NO. =
mAs =
CAL. NO. =
mAs =
CAL. NO. =
mAs =
CAL. NO. =
mAs =
CAL. NO. =
mAs =
CAL. NO. =
Table 3D-9: Breakpoint calibration worksheet
Ch # 901476-05
Rev. A
O.D. =
O.D. =
O.D. =
O.D. =
O.D. =
O.D. =
O.D. =
O.D. =
O.D. =
O.D. =
O.D. =
O.D. =
O.D. =
O.D. =
O.D. =
O.D. =
3D
AEC Calibration
Page 3D-21