Figure 3-64 Installing a smart ETH gateway
Step 2 Connect one end of the ground cable available in the smart ETH gateway package
to the ground point at the lower part of the cable trough using one M4 screw, and
connect the other end to the ground point on the side of the smart ETH gateway,
as shown in
Step 3 Install the smart ETH gateway to the guide rail, as shown in
1.
2.
3.
----End

3.10.2 Installing an Electronic Clasp Lock

Context
● The electronic clasp lock is not required in the 1350 mm deep scenario.
● In the 1600 mm deep scenario, an electronic clasp lock needs to be installed on
● An electronic clasp lock needs to be installed on the front door of the PDF only
Issue 03 (2021-07-15)
Figure
3-64.
NO TE
The M4 screw used for connecting the ground cable to the cable trough is available in the
cable trough package.
Align the upper slot of the guide rail for the smart ETH gateway with the
upper part of the guide rail, and pre-mount it onto the guide rail.
Press the lower part of the smart ETH gateway to clamp the smart ETH
gateway onto the guide rail.
Shake the smart ETH gateway in different directions to ensure that it is
reliably installed.
NO TICE
the front and rear doors of each smart cooling product and IT equipment. The
position of the electronic clasp lock depends on the positioning plate.
in the cold aisle containment scenario, but cable connection is not required.
Copyright © Huawei Technologies Co., Ltd.
3 Hardware Installation
Figure
3-64.
67

Advertisement

Table of Contents
loading

This manual is also suitable for:

V100r021c10

Table of Contents