Distribution > General Input Unit > Power Distribution Unit > Running
Parameters > Unhide All Advanced Signals > Power Distribution Settings.
----End

5.2.5 Commissioning a Smart rPDU

Prerequisites
One end of the straight-through cable has been connected to the COM port on
the rPDU and the other end has been connected to the COM port on the ECC800-
Pro or ETH converter.
Context
Table 5-11 rPDU basic information
Model
PDU2000-32-1PH
-20/4-M1/CLEVER
PDU2000-32-1PH
-20/4-M1/HPX
MD-1324-2004
PN1-32I10-20E4G
-AV4
ZFIF-112-0800
PN1-16X18-8E-
AH4W
ZZIF-130-2004
PN1-32I15-20E4G
-AV4W
a: The barcode starts with 21 and is attached to the device.
The PDU2000-M(C) and PDU2000-M(H) are used as examples.
Procedure
Step 1 Set the PDU2000 monitoring parameters.
Issue 03 (2021-07-15)
Vendor
Clever
HPXIN
Clever
HPXIN
Clever
HPXIN
Clever
HPXIN
Set the PDU2000-M (C) monitoring parameters.
Copyright © Huawei Technologies Co., Ltd.
5 Power-On Commissioning
Name Displayed
on the WebUI
PDU2000-M(C)
PDU2000-M(H)
rPDU-MPDU
rPDU-PN
rPDU
Eleventh and
Twelfth
Characters in
Device Barcode
a
FT
6B
FT
6B
FT
6B
FT
6B
138

Advertisement

Table of Contents
loading

This manual is also suitable for:

V100r021c10

Table of Contents