FusionModule2000-S Smart Modular Data Center
User Manual
Step 3 Use four M5x10 tapping screws to secure it at the front holes on the top of the
cabinet. The following figure shows the installation positions.
Figure 3-24 Securing the top beam
Step 4 Use three M5x10 tapping screws to secure the enclosure frame to the bottom of
the cabinet.
Figure 3-25 Securing the enclosure frame to the bottom of the cabinet
----End
Issue 03 (2021-07-15)
Copyright © Huawei Technologies Co., Ltd.