The PSU is hot-swappable.
Procedure
Step 1 Push the locking latch in the upper right corner of the PSU panel leftwards.
Step 2 Pull out the handle of the PSU to remove the PSU from the subrack.
Step 3 Gently push the reserved PSU into the subrack along guide rails, and push the
locking latch rightwards to secure the handle.
Figure 6-8 Replacing a PSU
----End
6.3.2.3 Replacing ECC800-Pro Antennas
Prerequisites
●
●
Procedure
Step 1 Remove the 4G antenna cables and RF_Z antenna cables connected to the ports
on the ECC800-Pro, as shown in