Huawei FusionModule2000-S User Manual page 236

Smart modular data center
Hide thumbs Also See for FusionModule2000-S:
Table of Contents

Advertisement

FusionModule2000-S Smart Modular Data Center
User Manual
Table 6-6 Quarterly maintenance for the cooling system
Maintenance
Item
Monitoring
Electric heater
Issue 03 (2021-07-15)
Method
Export smart
cooling
product logs,
alarms,
temperature,
humidity, and
the operating
status and
time of the
compressor,
fan, electric
heater,
humidifier,
and water
pump from
the
monitoring
system. View
the historical
alarms
generated and
select the
most common
five ones. (If
no monitoring
system is
available, skip
this item.)
Start the
equipment,
choose Maint
> Diagnostic
Mode > Enter
on the main
screen, and
start the
electric heater.
NOTE
To avoid burns,
do not touch
the electric
heater surface
with bare skin.
Copyright © Huawei Technologies Co., Ltd.
6 Operation and Maintenance
Expected Result
There are no
abnormal records in
alarms.
The electric heater
generates heat.
Troubleshooting
Rectify the fault or
contact Huawei
technical support.
Replace the electric
heater.
227

Advertisement

Table of Contents
loading

This manual is also suitable for:

V100r021c10

Table of Contents