FusionModule2000-S Smart Modular Data Center
User Manual
Figure 5-62 Setting the high-density island solution
Step 4 Go to the linkage control page and check that Enable linkage control function is
set to Yes. Set the linkage control signals in the high-density island scenario to on.
Figure 5-63 Setting linkage control in the high-density island scenario
----End

5.3.14 (Optional) NetEco Management

5.3.14.1 Connecting a Communications Cable

Networking Through the WAN1 Port
Step 1 Connect the communications cable to the WAN1 port on the ECC800-Pro.
Figure 5-64 Connecting a communications cable
----End
Issue 03 (2021-07-15)
Copyright © Huawei Technologies Co., Ltd.
5 Power-On Commissioning