Huawei FusionModule2000-S User Manual page 120

Smart modular data center
Hide thumbs Also See for FusionModule2000-S:
Table of Contents

Advertisement

FusionModule2000-S Smart Modular Data Center
User Manual
Figure 4-12 Installing load cables
(1) Ring buckle
Step 6 Install cascading cables.
If a 48 V cascading cable needs to be prepared onsite, ensure that the wire with a
red tube is inserted into the terminal pin marked in red and the wire with a black
tube is inserted into the terminal pin marked in blue.
Issue 03 (2021-07-15)
NO TICE
Copyright © Huawei Technologies Co., Ltd.
(2) Spring buckle
4 System Cabling
(3) Red line
111

Advertisement

Table of Contents
loading

This manual is also suitable for:

V100r021c10

Table of Contents