Procedure
Step 1 Keep a vertical plate of the cable trough flush with the top surface of the cabinet
and clamp the clasps into the mounting holes in the first row counting from the
front door to the rear door.
Figure 3-35 Clamping a vertical plate
Step 2 Rotate the vertical plate by 90 degrees to stand it on the top plate of the cabinet.
Figure 3-36 Rotating the vertical plate by 90 degrees
Step 3 Install the other vertical plate into the mounting holes in the second row counting
from the front door to the rear door in the same way. Install one M5x10 tapping
Issue 03 (2021-07-15)