Figure 3-86 Installing a guide rail
Install a filler panel for guide rails. Fasten the M6 screws to install the filler
panel for the guide rails.
Figure 3-87 Installing a filler panel for guide rails
Install the cage nuts that secure the IVS1800. The cage nut installation
locations are the first and sixth holes along the guide rails, as shown in the
following figure.
Figure 3-88 Installing cage nuts
Install mounting ears. Use a PH2 screwdriver to secure the mounting ears to
both sides of the front panel of the device with four screws on each side.
When the device is near the front door of the cabinet, fasten screws in hole
groups 1 and 2; when the device is near the rear door, fasten screws in hole
groups 2 and 3.