Huawei FusionModule2000-S User Manual page 107

Smart modular data center
Hide thumbs Also See for FusionModule2000-S:
Table of Contents

Advertisement

FusionModule2000-S Smart Modular Data Center
User Manual
Figure 3-115 Water sensor
(1) Water detector
(4) Conversion cable end B,
connected to the water
detection cable
Figure 3-116 Laying out the water detection cable
Issue 03 (2021-07-15)
NO TE
● The following figure shows how to lay out the water detection cable in the five-cabinet
scenario where the pipe is routed from the bottom.
● In the scenario where pipe is routed from the top, the water detection cable is bound to
the pipe.
Copyright © Huawei Technologies Co., Ltd.
(2) Conversion cable end A,
connected to the water
detector
(5) Water detection cable end
A, connected to the conversion
cable
3 Hardware Installation
(3) Conversion cable
(6) Water detection cable
98

Advertisement

Table of Contents
loading

This manual is also suitable for:

V100r021c10

Table of Contents