Huawei FusionModule2000-S User Manual page 38

Smart modular data center
Hide thumbs Also See for FusionModule2000-S:
Table of Contents

Advertisement

FusionModule2000-S Smart Modular Data Center
User Manual
Procedure
Step 1 Adjust the base height.
1.
2.
Issue 03 (2021-07-15)
Measure the distance (H) between the concrete floor and the upper surface
of the ESD floor using a ruler and record the value of H.
Figure 3-6 Measuring the ESD floor height
Adjust the base height to H and tighten the height locking bolts on the feet.
Copyright © Huawei Technologies Co., Ltd.
3 Hardware Installation
29

Advertisement

Table of Contents
loading

This manual is also suitable for:

V100r021c10

Table of Contents