FusionModule2000-S Smart Modular Data Center
User Manual
6.
● When a cable terminal is connected in place, you will hear a click.
● You need to install a ring buckle to fasten the cable terminal.
● If not prefabricated, the cables from the power distribution unit to the cabinet
Table 4-2 Load cable silk screen
Output Connector
XT1
XT2
XT3
Issue 03 (2021-07-15)
Check whether the round connector is securely installed. You can slightly pull
the connector to check whether it is loose. If it is loose, install it again.
NO TICE
rPDU need to be prepared onsite. For details, see the appendix
Load
Cables.
Copyright © Huawei Technologies Co., Ltd.
Single-Phase Power
Distribution Unit
QF1
QF2
QF3
QF4
QF5
QF6
4 System Cabling
7.3 Preparing
Three-Phase Power
Distribution Unit
QF1
QF2
-
110