Installing The 493.02 Chassis (Flextest Se) - MTS Systems FlexTest IIm Manual

Table of Contents

Advertisement

Installing the 493.02 Chassis (FlexTest SE)

Installing the 493.02 Chassis (FlexTest SE)
Contents
Installing the Plug-in Modules
48
Installation
Artisan Technology Group - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisantg.com
This section describes how to install the MTS FlexTest 493.02 chassis
and connect it to your system components.
Installing the Plug-in Modules
VMEbus Modules
Chassis Installation Options
Connecting Electrical Power
Installing the Handle Kit
This section describes how to install the plug-in modules into the
chassis. The modules plug into a backplane connector and are secured
to the chassis with a screw at the top and bottom of the faceplate.
The plug-in modules contain static-sensitive components.
Improper handling of the module can cause component damage.
Be sure to follow these precautions when handling modules:
Turn off electrical power before installing or removing a module.
Use a static ground strap to ground yourself to the chassis ground
before touching the chassis or a module.
Keep unused modules in conductive bags. Also be sure you are
grounded when removing a module from a conductive bag.
Handle modules with their front panel or circuit card edges. Do not
touch any circuit card components, pins, or circuit connection points.
41
49
50
52
56
MTS 793 Controller Hardware

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the FlexTest IIm and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

This manual is also suitable for:

Flextest gtFlextest se

Table of Contents

Save PDF