Post Installation Procedures
Preliminary
Table 6-1.
Post-Installation Checklist
Check
When
Verify that:
Done
All items listed in the Equipment Specification have been installed.
Shipping container is properly packed with ramp and frame dollies and
shipped to Tekelec.
NOTE: This check applies only after a heavy duty frame has been
installed.
The site is clean.
Systems are neat, clean, and level.
All cable connections are checked to ensure a tight and complete connection.
Cabling is neatly installed and the labels are correct and easily readable.
Power cabling does not run through a cable rack.
Power cabling is not routed together with any other cables and has at least six
inches of clearance.
Racks have protective paper between the rack and any cables that would
otherwise touch the rack.
The main ground cable is correctly labeled and is marked "TO and "FROM"
with the "Do Not Remove" tag installed on both ends of the cable at the
grounding.
The -48 VDC power feeds are correctly labeled at the site power distribution
panel. There should be an A feed and a B feed for each breaker panel.
NOTE: This check applies only in a DC environment.
The T1100 AS power supply module is plugged in to the AC power source.
NOTE: This check applies only in an AC environment.
Any -48 VDC BATT and RTN cables are correctly labeled.
Earthquake bracing, if any, is properly installed.
Adequate floor clearances have been maintained.
Panels, if any, are correctly installed.
Cable sheets are properly filled out.
Documentation has been received and is properly stored.
OOBM Modems are operational.
NOTE: Use a minimum of 26 AWG telecommunications line cord for
connection to the modem.