Procedure 6-6.
NOTE: This logic grounding procedure applies only when you have
exactly two T1100 AS servers in an AC cabinet. If you have only one server,
or more than two servers, contact Tekelec Customer Care Center for
assistance.
1.
Attach one end of the logic ground cable to the logic ground port at the back
of one of the T1100 AS servers. Next, attach the other end of the logic ground
cable to the logic ground port of the other server as shown in Figure 6-6 on
page 6-12.
Figure 6-6. Logic Ground Cable Route in AC Environment
6-12
Preliminary
Connect Logic Ground Between Logic Ground Ports
Logic Ground
Port
Logic Ground
Port
Post Installation Procedures
AC Cabinet
910-2969-001 Revision H, February 2007