Figure 5-10. Side Cable Management Arm Installation (T1000 AS shown)

NOTE: The mounting position for the additional server may vary. The
position shown in Figure 5-10 is for example only. T1000 shown, but
mounting is the same for the T1100.
15.
Route and connect the power and data cables through the cable management
arm to the T1100 AS chassis. Check the labels on the cables and attach them to
the appropriate connectors on the rear of the T1100 AS chassis (see
Figure 5-11). For information about cables used, see "How to Cable
Components Added to Existing Frames" on page 5-14.
5-12
How to Install Hardware in an Existing Frame
Preliminary
Attach Left Side
Cable Management
Arm Here
910-2969-001 Revision H, February 2007
Attach Right Side
Cable Managemen