How to Install a T1100 AS Frame
13.
Lower the frame onto the floor with the holes in the frame aligned over the
threaded rod assemblies. For instructions about how to lower the frame, refer
to 822-0094-02.
14.
Over each threaded rod, install the following components in the order shown
(see Figure 4-4 on page 4-10):
a.
Nylon shoulder washer (through the holes in the frame and isolator pad
and into the raised floor)
b.
Fiber washer (around the nylon shoulder washer)
c.
Square holddown plate
d.
Large steel washer
e.
Small steel washer
f.
Torque nut
15.
For each threaded rod, finger-tighten the torque nut inside the frame.
WARNING: Finger-tighten nuts on threaded rods inside the frames above
the raised floor before finger tightening the nuts below the raised floor.
16.
For each threaded rod, finger-tighten the 5/8 inch nut and washers against the
bottom of the floor tile (see Figure 4-5 on page 4-12).
NOTE: Tighten only until the washers and nuts are flush with the bottom
of the floor tile. DO NOT over tighten, causing the tile or frame to tilt.
17.
With a 3/4 inch (19mm) socket wrench, tighten each torque nut inside the
frame until the twist off nut above the plastic red cover breaks free. Leave the
twist off nut on the threaded rod to indicate that the torque on the nut beneath
has been set properly.
18.
If any tiles were removed to access the underside of the raised floor, replace
them.
19.
This procedure is complete.
Next, go to Procedure 4-8, "Attach Overhead Rack Support," on page 4-19.
How to Anchor on Raised Floor Using Support Channel
Use the following procedure to anchor the HD frame to the raised floor tiles using
the anchor assembly shown in Figure 4-6.