Chapter 5. How To Install Hardware In An Existing Frame; Introduction; How To Unpack And Conduct Inventory - Tekelec 1100 Hardware Manual

Application server
Hide thumbs Also See for 1100:
Table of Contents

Advertisement

Introduction

This chapter describes how to unpack install individual T1100 AS hardware
system components and install them in frames that are already installed at
customer sites.
NOTE: Some of the figures in this section show the T1000 AS. The T1000 is
identical in size to the T1100, and the frame installation instructions are the
same for both chassis.
For information about installing a T1100 AS hardware system that is delivered in
a frame, see Chapter 4, "How to Install a T1100 AS Frame."

How to Unpack and Conduct Inventory

When the individual T1100 AS unit arrives, perform the following procedure:
Procedure 5-1.
1.
Inspect the shipping container for indication of damage. If damage is noted,
go to step 7.
DANGER: Moving a T1100 AS chassis requires two people. Each T1100
AS chassis weighs approximately 30 kg (65 lbs) and may cause personnel
injury or damage to the internal components due to shock and vibration if
not handled properly.
2.
Inventory the material in the shipping container. If any discrepancies are
noted, go to step 7.
WARNING: Observe proper ESD procedures when handling the T1100
AS chassis. Always wear an ESD wrist strap connected to a grounded bench
or frame.
3.
Unpack the T1100 AS chassis from the shipping container and place the unit
on a secure workbench that is grounded for ESD protection. Discard the
container and packing material.
4.
Inspect the T1100 AS chassis for indication of damage. If damage is noted, go
to step 7.
5-2
Preliminary
Unpack a T1100 AS Chassis
How to Install Hardware in an Existing Frame
910-2969-001 Revision H, February 2007

Advertisement

Table of Contents
loading

Table of Contents