Figure 6-3. Chassis Ground Cable Attachment Location In Dc Environment; Procedure 6-3. Connect T1100 As Chassis Ground T1100 As Chassis To Frame - Tekelec 1100 Hardware Manual

Application server
Hide thumbs Also See for 1100:
Table of Contents

Advertisement

Post Installation Procedures
7.
This procedure is complete.
Next, go to Procedure 6-3, "Connect T1100 AS Chassis Ground: T1100 AS Chassis
to Frame," on page 6-7.
How to Connect T1100 AS Chassis Ground from T1100 AS Chassis to Frame in
DC Environment
In a DC environment, use this procedure for each T1100 AS unit in the heavy duty
frame.
Procedure 6-3.
1.
Remove the nuts on the T1100 AS chassis ground lugs on the back of the
server (see Figure 6-3 on page 6-7).
Figure 6-3. Chassis Ground Cable Attachment Location in
12-24 Phillips head
screw with
captive star washer
(typical)
12-24 Phillips head
screw with
captive star washer
(typical)
910-2969-001 Revision H, February 2007
Preliminary
Connect T1100 AS Chassis Ground: T1100 AS Chassis to Frame
DC Environment
Frame Ground To Tap
To PANI Isolated
#6AWG
Frame Ground
RTN
(1,3)
BAT
RTN
(5,7)
BAT
RTN
(9,11)
BAT
(SHELF 1A)
BUS B
RTN
(2,4)
BAT
RTN
(6,8)
BAT
RTN
(10,12)
BAT
Chassis ground
Cable must fill and
be visible
in lug window
Frame Rear
Frame Ground
Logic Ground
Ground strap
Terminal Strip
RTN (1,3)
BAT
(SHELF 3A)
(SHELF 2A)
(SHELF 3B)
(SHELF 2B)
(SHELF 1B)
BUS A
J1
J2
RTN (2,4)
BAT
LOGIC GND
FRAME GND
RTN (5,7)
BAT
RTN
(9,11)
BAT
RTN (6,8)
BAT
RTN (10,12)
BAT
6-7

Advertisement