Chapter 4. How To Install A T1100 As Frame; Introduction; How To Unpack The T1100 As Frame And Conduct Inventory - Tekelec 1100 Hardware Manual

Application server
Hide thumbs Also See for 1100:
Table of Contents

Advertisement

Introduction

This chapter describes how to unpack and install in a DC environment a
heavy-duty frame that contains from one or more T1100 AS units and associated
equipment.
NOTE: Some of the figures in this section show the Tekelec T1000. The T1000
is identical in size to the T1100, and the frame installation instructions are the
same for both chassis.
For information about installing a T1100 AS unit in an AC environment and about
installing an additional T1100 AS unit into a heavy-duty frame that already
contains from one to four T1100 AS units, see Chapter 5, "How to Install
Hardware in an Existing Frame."
NOTE: The total number of T1100 AS units allowed in a frame depends on
the application. For more complete information about the maximum
configuration allowed by the application, refer to the

How to Unpack the T1100 AS Frame and Conduct Inventory

When the T1100 AS hardware system frame arrives, perform the following
procedure:
Procedure 4-1.
1.
Unpack the heavy-duty frame, using the procedure described in 822-0094-02.
2.
Ensure that all the parts listed on the packing list have been received.
3.
Ensure that the part numbers on the labels on the left and right sides of each
T1100 AS unit match the sales order for each of the following categories:
• Base configuration for hard disk
• Installed memory information
• PCI card configuration
For information about the fields on a label, see "T1100 AS Chassis Part
Number Information" on page B-14.
4.
Be sure to return the frame's shipping container, as described in 822-0094-02.
5.
This procedure is complete.
4-2
Preliminary
How to Unpack Frame and Conduct Inventory
How to Install a T1100 AS Frame
assembly
910-2969-001 Revision H, February 2007
drawing.