Basic Sequence - Canon imagePRESS C1 P Service Manual

Imagepress c1 series
Table of Contents

Advertisement

Chapter 7

7.3 Basic Sequence

7.3.1 When Turning the Power ON
imagePRESS C1 P / imagePRESS C1
In case of turning on the main power switch when the temperature of the fixing roller surface is under 50 deg C. (when turning on the main power switch after
leaving it for a long time, e.g., in the morning)
1. Feature
- Right after starting the sequence, execute the HP detection of the developing rotary and eliminate static from the drum surface.
- The approximate time required from turning on the main power switch to being the standby state is about 9min 10sec. (max. time is less than 11min 40sec)
- During the warm-up rotation, the following controls are executed:
Wire cleaning, potential control, primary/secondary transfer ATVC control, ITB cleaner ACVC control, ATR patch control, development idle rotation control,
D-half control *1
*1: Execute the control if there is the history of more than 500 sheets color printing, or when the environment is changed.
7-8
2.Developing
Block
5. ITB Cleaning
Block
[10]
Delivery
[9]
4. Fixing Block
1.Electrostatic Latent Image Formation Block
[2]
[3]
[1]
Photosensitive Drum
[4]
[12]
[5]
[6]
3.Transfer Block
[7]
[8]
[11]
6.Cleaning Block
of Secondary
Transfer Block
F-7-8
7.Photosensitive
Drum Cleaning Block
ITB
Pickup
Registration
0012-6528

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Imagepress c1Imagepress c7000 series

Table of Contents