The items to be implemented in this control differ by the condition (environment or the duration status of the image formation system parts) of the product.
Following are the control items in each sequence.
Control item
Potential control
Full: approx. 20 sec
Simple: approx. 4.5 sec
Patch sensor light
approx. 30 sec
intensity correction
D-half control
approx. 22 sec
ARCDAT control
approx. 20 sec
First idle rotation in the
approx. 60 sec
morning
Primary transfer ATCV
approx. 13.6 sec
control
Secondary transfer
approx. 1 sec
ATCV control
*1: Full potential control
*2: Implemented after potential control
*3: Fixing temperature at a certain level or less
*4: At single-color (Bk)
Full colors are 100 sheets
*5: At single-color (Bk)
Full colors are 500 sheets
*6: Simple potential control
7.4.4 Image Stabilization Control Timing
imagePRESS C1+ (Printer) / imagePRESS C1+
The items to be implemented in this control differ by the condition (environment or the duration status of the image formation system parts) of the product.