3. Route the switch harness (A) through the welded hose
guide on feeder house.
4. Secure the switch harness (A) at multicoupler with a
cable tie. Leave 100 cm (40 in.) extending past
location (B).
5. Route the switch harness (A) up to the underside of the
cab floor.
IMPORTANT:
To prevent damage to harness, ensure adequate slack
by lowering the feeder house fully before securing
harness with cable tie.
214325
ASSEMBLING HEADER AND ADAPTER
46
Figure 3.69: 60/70 Series Harness Routing
Figure 3.70: Switch Harness Routing
Figure 3.71: Switch Harness Routing
Revision A