4. Rotate tine tube crank (A) and position link (B) so
attachment holes in bar crank are aligned with hole
in link.
5. Install bolt (C) in link, and position shim (D) on bolt so
that shim is between link and tine bar crank.
NOTE:
Bolts are precoated with Loctite
method is required.
6. Realign link (B) and tine bar crank (A), and thread in
bolt (C).
7. Repeat for remaining tine bars and torque bolts to
165 Nm (120 lbf·ft).
8. Position reel pitch at position 4 to access bolt (A) after
rotating reel. Reposition reel pitch to position 2
when done.
NOTE:
This procedure is done only on right reel.
3.4.2 Repositioning Gearbox
To reposition the gearbox, follow these steps:
1. Remove shipping wire and wrapping on brace (A).
Swing brace clear of gearbox.
214325
ASSEMBLING HEADER AND ADAPTER
®
, so no further locking
80
Figure 3.153: Tine Bar Crank and Link
Figure 3.154: Right Reel with Cam
Arms Attached
Figure 3.155: Shipping Wire and Brace
Revision A