Setup Process |«Ÿr J - YASKAWA yasnac i80m Instruction Manual

Cnc system for machining centers
Table of Contents

Advertisement

Setup
Process
[SET]
The
setup process
is
preparation
for
cutting.
In this
process,
the
following
can
be
displayed
and
set
up
:
work
coordinate
system
shift
amount,
tool
offset,
and tool life control data. The data can be displayed or
set up any
time regardless of
the controller
operation
mode.
3.4.6
Q
Depress
the
B
Select
a job by depressing
the
|
WORK
|, |
TOOL
|.
or
|
T-LIFE
|
%
job
soft
key. Otherwise, depress the
until the
target
job appears.
key a
number of times
l
Work coordinate
system job-ÿSee
Par. 3.4.6.1
(page
448.)
•See Par. 3.4.6.2 (page 454
J
See Par. 3.4.6.3
(page
473
J
Tool
job
-
Tool life control
job
at
P°wer
ON
can
be selectd using these
parameters
:
Pm3003 D2
=
0
:
Selects work coordinate
system
job
at power
ON.
Pm3003 D2 =
1
:
Selects tool
job at power
ON.
-
447
-

Advertisement

Table of Contents
loading

Table of Contents